HUB Miami Residences (Greater Downtown Miami)

  • Published by Peter Zalewski
  • 1/5/2024
  • 6:10:11 PM

This is a link for more information on this project and/or to schedule a viewing.

Project Description:

At HUB Miami, sleek architecture meets modern spaces and thoughtfully curated amenities that seamlessly blend work and leisure. Discover everything under one roof for the perfect balance of life, work, and play in downtown Miami.

– 306 Luxury Condos with spectacular views
– 41 Stories with Furnished Studios to 2 bedrooms configurations
– Spectacular Interiors and modern finishes

For More Information, Click Here

CraneSpotters Preconstruction Condo Project Overview

Condo Description Details
PROJECT NAME HUB Miami Residences
 ADDRESS 530 NW 1st Ct Miami, FL 33138
 SUBMARKET Greater Downtown Miami
 COUNTY Miami-Dade
 WATERFRONT PROJECT No
 TYPE OF WATERFRONT?
 NUMBER OF TOWERS 1
 TOTAL FLOORS (BY ELEVATOR) 41
 TOTAL RESIDENTIAL UNITS 306
 BED RANGE                        Studios to 2 Bedrooms
 RANGE OF SQUARE FEET                          394 TO 1,048
 UNIT TYPE – TOTAL UNITS –   SQUARE FEET                             1 BED – XX – X,XXX SF
 UNIT TYPE – TOTAL UNITS –   SQUARE FEET                              2 BED – XX – X,XXX SF
 UNIT TYPE – TOTAL UNITS –   SQUARE FEET                              3 BED – XX – X,XXX SF
 UNIT TYPE – TOTAL UNITS –   SQUARE FEET                              4 BED – XX – X,XXX SF
 MINIMUM PRICE PER UNIT $ 490,000
 MONTHLY MAINTENANCE FEE PER   UNIT
 MONTHLY MAINTENANCE FEE PER   SQUARE FOOT $ 1,35
 TURNKEY READY YES
 PROPERTY AMENITIES
  1. Resident lounge and entertainment room

  2. Co-working lounge with offices and phone pods

  3. State-of-the-art fitness center

  4. Yoga and spin room

  5. Spa with sauna and cold plunge pool

  6. Dedicated residential lobby

  7. 24/7 concierge services

  8. 24/7 security services

  9. High-speed elevators

  10. Controlled property access

  11. Sky Lounge bar
  12. Resort Style pool
 WATER VIEWS
 PETS PERMITTED TBD
 MAXIMUM NUMBER OF PETS
 RENTAL TIMES PER YEAR 365
 TOTAL ONSITE PARKING SPACES
 FIRST DEPOSIT %
 SECOND DEPOSIT %
 THIRD DEPOSIT %
 FOURTH DEPOSIT %
 TOTAL DEPOSIT %
 UNIT FINANCING AVAILABLE
 RECOMMENDED LENDERS
 PROJECT STATUS    Approved
 PRESALES UNDERWAY?
 RATIO OF PRESALES
 SCHEDULED CONSTRUCTION   START
 SCHEDULED COMPLETION DATE 2027
 YEAR COMPLETED
 DEVELOPER The John Buck Company / FVP / BH Group / PEBB
 COUNTRY OF DEVELOPER United States
 DEVELOPER FEE %
 ARCHITECT ODP Architecture & Design
 ARCHITECTURAL FIRM
 GENERAL CONTRACTOR
 DATE OF GROUNDBREAKING   PARTY
 NOTICE OF COMMENCEMENT   FILED
 DATE CRANE ERECTED
 DATE OF CONDO DECLARATION   FILING
 DATE OF CONDO LAUNCH PARTY
 DATE OF TOPPING OFF
 DATE OF FIRST RECORDED   TRANSACTION
 LEAD LENDER
 LEAD LOAN AMOUNT
 DATE OF LEAD LOAN
 SECONDARY LENDER
 SECONDARY LOAN AMOUNT
 DATE OF SECONDARY LOAN
 CONDO PROJECT WEBSITE
 INHOUSE SALES BROKERAGE
 INHOUSE SALES REPRESENTATIVE
 INHOUSE SALES REP TELEPHONE
 INHOUSE SALES REP EMAIL   ADDRESS
 INHOUSE SALES BROKERAGE   ADDRESS
 BUYSIDE COMMISSION %
 PRICING SURVEY DATE
 MINIMUM PRICE PER DOOR
 MINIMUM PRICE PER SQUARE  FOOT
 SALES RATION
 COMMISSION %
 INCENTIVES

 

Leave a Reply

Skip to content