Aria Reserve (Greater Downtown Miami)

  • Published by Peter Zalewski
  • 12/5/2023
  • 1:47:01 PM

This is a link for more information on this project and/or to schedule a viewing.

Project Description:

A new chapter in residential sophistication. Here, the idea of a life well lived has been completely transformed so that the beauty of nature and the convenience of state-of-the-art lifestyle amenities exist in perfect balance with one another. Aria Reserve brings the tallest waterfront, residential twin towers in the United States. The iconic profile in the heart of Miami, and prestigious waterfront position on Biscayne Bay, makes Aria Reserve feel like a private estate hidden away from the rest of the world. The uniquely modern relationship between design and nature creates an atmosphere of total serenity.

For More Information, Click Here

CraneSpotters Preconstruction Condo Project Overview

Condo Description Details
PROJECT NAME Aria Reserve
 ADDRESS 700 NE 24TH Street Miami, FL 33137
 SUBMARKET Greater Downtown Miami
 COUNTY Miami- Dade
 WATERFRONT PROJECT Yes
 TYPE OF WATERFRONT? Bay
 NUMBER OF TOWERS 2
 TOTAL FLOORS (BY ELEVATOR) 62
 TOTAL RESIDENTIAL UNITS 792
 BED RANGE                             1 TO 4
 RANGE OF SQUARE FEET                           1,059 TO 2,584
 UNIT TYPE – TOTAL UNITS –   SQUARE FEET                             1 BED – XX – X,XXX SF
 UNIT TYPE – TOTAL UNITS –   SQUARE FEET                              2 BED – XX – X,XXX SF
 UNIT TYPE – TOTAL UNITS –   SQUARE FEET                              3 BED – XX – X,XXX SF
 UNIT TYPE – TOTAL UNITS –   SQUARE FEET                              4 BED – XX – X,XXX SF
 MINIMUM PRICE PER UNIT $ 800k
 MONTHLY MAINTENANCE FEE PER   UNIT
 MONTHLY MAINTENANCE FEE PER   SQUARE FOOT TBA
 TURNKEY READY
 PROPERTY AMENITIES Pool, Spa, Cabana, Picnic Area, Children’s play Area ,Club Room, Gym, Basketball court,
 WATER VIEWS
 PETS PERMITTED
 MAXIMUM NUMBER OF PETS
 RENTAL TIMES PER YEAR
 TOTAL ONSITE PARKING SPACES
 FIRST DEPOSIT %
 SECOND DEPOSIT %
 THIRD DEPOSIT %
 FOURTH DEPOSIT %
 TOTAL DEPOSIT %
 UNIT FINANCING AVAILABLE
 RECOMMENDED LENDERS
 PROJECT STATUS      Under Construction
 PRESALES UNDERWAY?
 RATIO OF PRESALES
 SCHEDULED CONSTRUCTION   START 2022
 SCHEDULED COMPLETION DATE 2025
 YEAR COMPLETED
 DEVELOPER MELO GROUP
 COUNTRY OF DEVELOPER Argentina
 DEVELOPER FEE %
 ARCHITECT Arquitectonica
 ARCHITECTURAL FIRM
 GENERAL CONTRACTOR
 DATE OF GROUNDBREAKING   PARTY
 NOTICE OF COMMENCEMENT   FILED
 DATE CRANE ERECTED
 DATE OF CONDO DECLARATION   FILING
 DATE OF CONDO LAUNCH PARTY
 DATE OF TOPPING OFF
 DATE OF FIRST RECORDED   TRANSACTION
 LEAD LENDER
 LEAD LOAN AMOUNT
 DATE OF LEAD LOAN
 SECONDARY LENDER
 SECONDARY LOAN AMOUNT
 DATE OF SECONDARY LOAN
 CONDO PROJECT WEBSITE
 INHOUSE SALES BROKERAGE
 INHOUSE SALES REPRESENTATIVE
 INHOUSE SALES REP TELEPHONE
 INHOUSE SALES REP EMAIL   ADDRESS
 INHOUSE SALES BROKERAGE   ADDRESS
 BUYSIDE COMMISSION %
 PRICING SURVEY DATE
 MINIMUM PRICE PER DOOR $800k
 MINIMUM PRICE PER SQUARE  FOOT
 SALES RATION
 COMMISSION %
 INCENTIVES

 

Leave a Reply

Skip to content